Monday, July 20, 2026
Village Voice News
ADVERTISEMENT
  • Home
  • News
  • Sports
  • Editorial
  • Letters
  • Global
  • Columns
    • Eye On Guyana
    • Hindsight
    • Lincoln Lewis Speaks
    • Future Notes
    • Blackout
    • From The Desk of Roysdale Forde SC
    • Diplomatic Speak
    • Mark’s Take
    • In the village
    • Mind Your Business
    • Bad & Bold
    • The Voice of Labour
    • The Herbal Section
    • Politics 101 with Dr. David Hinds
    • Talking Dollars & Making Sense
    • Book Review 
  • Education & Technology
  • E-Paper
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Sports
  • Editorial
  • Letters
  • Global
  • Columns
    • Eye On Guyana
    • Hindsight
    • Lincoln Lewis Speaks
    • Future Notes
    • Blackout
    • From The Desk of Roysdale Forde SC
    • Diplomatic Speak
    • Mark’s Take
    • In the village
    • Mind Your Business
    • Bad & Bold
    • The Voice of Labour
    • The Herbal Section
    • Politics 101 with Dr. David Hinds
    • Talking Dollars & Making Sense
    • Book Review 
  • Education & Technology
  • E-Paper
  • Contact Us
No Result
View All Result
Village Voice News
No Result
View All Result
Home News

Contracts totaling $688.1M signed for reconstruction of Christ Church Secondary School

Admin by Admin
June 13, 2023
in News
DSC06136: The Honourable Minister of Education, Priya Manickchand, Permanent Secretary, Mr. Alfred King (left), Special Projects Officer, Mr. Ron Eastman (right) along with representatives of the contracting firms pose for a photograph following the signing of the contracts.

DSC06136: The Honourable Minister of Education, Priya Manickchand, Permanent Secretary, Mr. Alfred King (left), Special Projects Officer, Mr. Ron Eastman (right) along with representatives of the contracting firms pose for a photograph following the signing of the contracts.

0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

Seven contracts were signed last Wednesday for the reconstruction of the Christ Church Secondary School, in Georgetown. The school was destroyed by fire on January 12, 2023. The displaced school children have since been accommodated at the Cyril Potter College of Education.

The new structure, which will cost a total of $688.1M will be built at the same location and is expected to be finished in seven months as per the contract.

READ ALSO

MV Barima: A Nation’s Tragedy Unfolds Amid Official Silence

APA Calls for Edghill’s Removal and Independent Review Following MV Barima Tragedy

Architectural concept of the Christ Church Secondary School, South-Western view
Architectural concept of the Christ Church Secondary School, South-Eastern view

The new building will measure 209 feet x 70 feet and will have 20 classrooms to accommodate 450 to 520 students. The school is also expected to feature all the science laboratories, TVET laboratory, electrical and Woodworking laboratory, Information Technology laboratory, Home Economics laboratory, and Art and Music rooms.

According to Minister of Education, Ms. Priya Manickchand, the project was divided into seven lots and companies were invited to bid for each lot. The invitation for bids was published in March 2023. Innovative Engineering Consultancy Services is the project Consultant

The new building will feature fire prevention and retardant mechanisms and components such as fire extinguishers, smoke detectors, and some materials that will be used that are not highly flammable.

Permanent Secretary of the Ministry of Education, Mr. Alfred King pointed out among the seven lots which the project has been divided into, there is a dedicated lot that deals with the installation of fire prevention units as recommended by the Guyana Fire Service.

During the 3-year-old Irfaan Ali government seven schools were destroyed by fire.

The seven lots and companies awarded are as follows:

Lot -1 Construction of Sub-Structure – BM Property Investment Inc. ($303,595,000.00)

Lot -2 Super-Structure – Zeco Group of Services Inc. ($295,137,706.00)

Lot -3 Installation of Electrical Infrastructure & Fixtures – N. Balgobin & Sons Contracting Service & Electrical Supplies ($41,938,500.00)

Lot -4 Installation of Plumbing Infrastructure and Fixtures – BM Property Investment Inc. ($17,600,000.00)

Lot -5 Installation of Air Conditioning Infrastructure and Units – A. Ograsein & Sons General Contracting ($10,745,000.00)

Lot -6 Installation of Fire Prevention Units – A. Ograsein & Sons General Contracting ($6,759,000.00)

Lot -7 Masonry and Finishing Work – Pantheon Construction Inc. ($12,385,800.00)

ShareTweetSendShareSend

Related Posts

MV Barima
News

MV Barima: A Nation’s Tragedy Unfolds Amid Official Silence

by Admin
July 20, 2026

By Mark DaCosta- Disclaimer: This article is a chronological compilation of what is being reported across the media landscape as...

Read moreDetails
News

APA Calls for Edghill’s Removal and Independent Review Following MV Barima Tragedy

by Staff Writer
July 20, 2026

The Amerindian Peoples Association has called for the removal of Minister of Public Works Juan Edghill and an independent investigation...

Read moreDetails
News

‘Blood on Their Hands’: Gopaul Says Tender Documents Show Govt Sent MV Barima to Sea Instead of Dry Dock

by Admin
July 20, 2026

The People's Progressive Party (PPP) Government knowingly placed lives at risk by allowing the MV Barima to continue operating despite documented evidence...

Read moreDetails
Next Post

WORD OF THE DAY: ADVOCATE


EDITOR'S PICK

JAMAICA | PNP Calls for Urgent Action to Support Poultry Farmers and Address Chicken Shortage

October 12, 2024

WORD OF THE DAY: EUPHORIA

October 25, 2024

Lone gunman robs Better Hope family of cash, jewellery

May 24, 2021
Police Commissioner Atlee Rodney.

Regional police commissioners pledge to work together

May 28, 2023

© 2024 Village Voice

No Result
View All Result
  • Home
  • News
  • Sports
  • Editorial
  • Letters
  • Global
  • Columns
    • Eye On Guyana
    • Hindsight
    • Lincoln Lewis Speaks
    • Future Notes
    • Blackout
    • From The Desk of Roysdale Forde SC
    • Diplomatic Speak
    • Mark’s Take
    • In the village
    • Mind Your Business
    • Bad & Bold
    • The Voice of Labour
    • The Herbal Section
    • Politics 101 with Dr. David Hinds
    • Talking Dollars & Making Sense
    • Book Review 
  • Education & Technology
  • E-Paper
  • Contact Us

© 2024 Village Voice