Friday, August 21, 2026
Village Voice News
ADVERTISEMENT
  • Home
  • News
  • Sports
  • Editorial
  • Letters
  • Global
  • Columns
    • Eye On Guyana
    • Hindsight
    • Lincoln Lewis Speaks
    • Future Notes
    • Blackout
    • From The Desk of Roysdale Forde SC
    • Diplomatic Speak
    • Mark’s Take
    • In the village
    • Mind Your Business
    • Bad & Bold
    • The Voice of Labour
    • The Herbal Section
    • Politics 101 with Dr. David Hinds
    • Talking Dollars & Making Sense
    • Book Review 
  • Education & Technology
  • E-Paper
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Sports
  • Editorial
  • Letters
  • Global
  • Columns
    • Eye On Guyana
    • Hindsight
    • Lincoln Lewis Speaks
    • Future Notes
    • Blackout
    • From The Desk of Roysdale Forde SC
    • Diplomatic Speak
    • Mark’s Take
    • In the village
    • Mind Your Business
    • Bad & Bold
    • The Voice of Labour
    • The Herbal Section
    • Politics 101 with Dr. David Hinds
    • Talking Dollars & Making Sense
    • Book Review 
  • Education & Technology
  • E-Paper
  • Contact Us
No Result
View All Result
Village Voice News
No Result
View All Result
Home News

EPA says new DHB unlikely to significantly impact the environment

Staff Reporter by Staff Reporter
August 23, 2021
in News
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

…persons who disagree may lodge appeals within 30 days from August 18

The Environmental Protection Agency (EPA) has decided that the proposed Replacement of the Existing Demerara Harbour Bridge (DHB) will not significantly affect the environment and therefore does not require the submission of an Environmental Impact Assessment (EIA).

READ ALSO

Linden Paid the Price—14 Years Later, Where Are the Promised Benefits?

Demerara Revolt: Solomon Blasts Government for Ignoring Historic Fight for Freedom

However, there must be the submission of an Environmental and Social Assessment and Management Plan (ESAMP) for the project to address specific issues identified in the screening process and detail mitigation measures to ensure that the proposed project can be undertaken in an environmentally sound and sustainable manner.

The Government is seeking to replace the DHB which has surpassed its technical life, in an effort to improve the efficiency of the transport system. The replacement bridge will span the Demerara River from Nandy Park to La Grange, upstream and in close proximity to the existing harbour bridge.

“The current bridge requires fundamental overhaul, replacement, maintenance and repair. Road capacity is limited due to the retraction system. Opening times are long due to the slow retraction process. The structure is vulnerable for incidents from vehicles and vessels as well as river forces. As the bridge is the only connection, the West Bank economy and population will suffer significantly in case the bridge cannot be used over a long time. There is currently no good alternative,” the project summary states.

The new location will allow easy connection to the existing access roads on the West Bank of Demerara and new access roads will be constructed on the East Bank of Demerara. The replacement structure will be a fixed four-lane bridge with a vertical clearance over the channel of approximately 50 meters above the maximum tide level. The proposed design allows for the bridge to be connected to the main road network through road approaches connecting it to the West Bank Public Road and the imminent Mandela to Eccles road, respectively

“In keeping with Section 11 (1) and (2) of the Environmental Protection Act, Cap. 20:05, the screening of this project resulted in it being categorized as having no significant impacts and minor issues can be addressed through appropriate and practical environmental safeguards informed by an Environmental and Social Assessment and Management Plan,” the EPA stated, adding:

“It must be noted that this decision is in no way an indication that the proposed project is approved by the EPA. This is a notice of exemption from the conduct of an EIA in accordance with Section 11 of the Act.”

The EPA also stated that it is satisfied that if a decision is taken to approve the project, robust measures can be prescribed to ensure compliance with the Environmental Protection Act, Cap. 20:05.

Even so, any person who may be affected by the proposed project may lodge an appeal against the Agency’s decisions within 30 days from August 18, 2021.

The DHB was constructed by the UK firm Mabey and Johnson and commissioned on July 02, 1978. It provides direct access to Region Three and indirect access from Georgetown to Regions One, Two, Seven and Eight. The pontoon bridge is maintained through tolls collected manually in one direction.

ShareTweetSendShareSend

Related Posts

L-R Then Region 10 Regional Chairman Sharma Solomon and then Prime  Minister Sam Hinds signing the Agreement- August 21, 2012
News

Linden Paid the Price—14 Years Later, Where Are the Promised Benefits?

by Admin
August 21, 2026

Fourteen years after the people of Linden staged a 33-day protest that forced the Government to reverse a controversial electricity...

Read moreDetails
Sharma Solomon MP (APNU)
News

Demerara Revolt: Solomon Blasts Government for Ignoring Historic Fight for Freedom

by Admin
August 21, 2026

More than two centuries after thousands of enslaved Africans rose against the brutal plantation system in Demerara, the legacy of...

Read moreDetails
News

GRSI Makes Aviation History, Opens New Lifeline to Guyana’s Hinterland

by Admin
August 21, 2026

A new chapter has opened in Guyana’s aviation history with Guyana Rotorcraft Services Inc. (GRSI) becoming the first domestic aviation...

Read moreDetails
Next Post

IOM calls for Prevention Against Discrimination Act to be amended


EDITOR'S PICK

It’s not that Govt can’t afford to pay teachers, political vindictiveness is driving non-payment  

May 19, 2024
A police officer directs Venezuelan refugees to a bus after their arrival at Los Iros beach, Erin, yesterday. (RISHI RAGOONATH)

Deportees defiantly return

November 25, 2020

Rice Farmers Demand Millions Owed by Essequibo Mill

March 13, 2026

ICT ROADSHOW 2026 LAUNCHES AT GOLDEN GROVE SECONDARY SCHOOL.

March 2, 2026

© 2024 Village Voice

No Result
View All Result
  • Home
  • News
  • Sports
  • Editorial
  • Letters
  • Global
  • Columns
    • Eye On Guyana
    • Hindsight
    • Lincoln Lewis Speaks
    • Future Notes
    • Blackout
    • From The Desk of Roysdale Forde SC
    • Diplomatic Speak
    • Mark’s Take
    • In the village
    • Mind Your Business
    • Bad & Bold
    • The Voice of Labour
    • The Herbal Section
    • Politics 101 with Dr. David Hinds
    • Talking Dollars & Making Sense
    • Book Review 
  • Education & Technology
  • E-Paper
  • Contact Us

© 2024 Village Voice