Sunday, August 23, 2026
Village Voice News
ADVERTISEMENT
  • Home
  • News
  • Sports
  • Editorial
  • Letters
  • Global
  • Columns
    • Eye On Guyana
    • Hindsight
    • Lincoln Lewis Speaks
    • Future Notes
    • Blackout
    • From The Desk of Roysdale Forde SC
    • Diplomatic Speak
    • Mark’s Take
    • In the village
    • Mind Your Business
    • Bad & Bold
    • The Voice of Labour
    • The Herbal Section
    • Politics 101 with Dr. David Hinds
    • Talking Dollars & Making Sense
    • Book Review 
  • Education & Technology
  • E-Paper
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Sports
  • Editorial
  • Letters
  • Global
  • Columns
    • Eye On Guyana
    • Hindsight
    • Lincoln Lewis Speaks
    • Future Notes
    • Blackout
    • From The Desk of Roysdale Forde SC
    • Diplomatic Speak
    • Mark’s Take
    • In the village
    • Mind Your Business
    • Bad & Bold
    • The Voice of Labour
    • The Herbal Section
    • Politics 101 with Dr. David Hinds
    • Talking Dollars & Making Sense
    • Book Review 
  • Education & Technology
  • E-Paper
  • Contact Us
No Result
View All Result
Village Voice News
No Result
View All Result
Home News

No extension will be granted to modernisation project at CJIA – Min. Edghill 

Staff Reporter by Staff Reporter
August 30, 2020
in News
Public Works Minister, Juan Edghill and Minister with in the Ministry, Deodat Indar are guided by Project Engineer Carrissa Goodings on the inspection of the CJIA. Also in photo is Adviser on Aviation, Lennox Shuman

Public Works Minister, Juan Edghill and Minister with in the Ministry, Deodat Indar are guided by Project Engineer Carrissa Goodings on the inspection of the CJIA. Also in photo is Adviser on Aviation, Lennox Shuman

0
SHARES
0
VIEWS
Share on FacebookShare on Twitter
Public Works Minister, Juan Edghill and Minister with in the Ministry, Deodat Indar are guided by Project Engineer Carrissa Goodings on the inspection of the CJIA. Also in photo is Adviser on Aviation, Lennox Shuman

The Ministry of Public Works will not be granting any extension to the ongoing modernisation project at the Cheddi Jagan International Airport (CJIA).

According to Public Works Minister, Juan Edghill, the consultant and the Chinese contractor, China Harbour Engineering Company (CHEC), now have approximately five days to produce a revised work plan to put a timeline to every item that needs to be fixed. On Saturday Edghill along with Minister within the Ministry of Public Works Minister, Deodat Indar inspected the CJIA facility. The project, which commenced during the PPP/C 2011-2015 tenure, should have been completed since December 31, 2018, by the former APNU+AFC Government.

READ ALSO

Shot Rings Out Near President’s Office, Suspected Warhead Recovered

Guyana’s Oil Wealth Must Create Real Opportunities for Young People- APNU

Noting that the venture was “mismanaged and corrupted” during the last five years, Minister Edghill explained that “what should have been a new airport has turned out to be a renovated facility.”

“The concerns and the problems are many, but I think what is of great importance now is to see that is project is completed in keeping with the agreed scope that they have signed on to…. we are way past the completed date. We are in the period of liquidated damages and anything that could have gone wrong has already gone wrong,” the Minister stated.

He reminded that “The contractor was supposed to design, build and hand over to the Government of Guyana, a project that was financed US $138 Million from the Exim Bank of China and US $12 Million from the Government of Guyana.”

The Public Works Minister said the government has expended way beyond its amount and yet there is a low percentage of success. He emphasised that COVID-19 will no longer be used as an excuse for the stalling of the project.

“We need to get all the resources that need to be imported for the completion of this project. Getting the Chinese technicians into the country is no longer a problem. As much as the airport is not operating for commercial airlines, the GCAA has been granting permission for chartered flights.” 

Meanwhile, following his evaluation of the project, Minister Indar also maintained that the Granger-led administration ignored a number of works which were originally mandated. “They are four air bridges when there were supposed to be eight. There is an empty apron that supposed to have air bridges on it with a building next to it. At the moment, where the building is supposed to be, there is a generating facility for generators,” Minister Indar noted.

According to him, the PPP/C Government now has to remedy the current impasse.

Meanwhile, among those areas inspected were the Aeronautical Information Management (AIM), the control tower, the Communication, Navigation and Surveillance (CNS) and the departure lounge.

Both Ministers witnessed protocols which were initiated by CJIA to ensure that COVID-19 precautions are observed by inbound and outbound flights.

The inspection exercise ended with a private meeting between the Ministers and the relevant personnel to ensure that the new Administration’s plans as it relates to the timelines are implemented. (DPI)

ShareTweetSendShareSend

Related Posts

Office of the President
News

Shot Rings Out Near President’s Office, Suspected Warhead Recovered

by Admin
August 22, 2026

Police have launched an investigation into a late-night gunfire incident near the Office of the President after a vehicle belonging...

Read moreDetails
Michael Richmond
News

Guyana’s Oil Wealth Must Create Real Opportunities for Young People- APNU

by Admin
August 22, 2026

The A Partnership for National Unity (APNU) has raised concerns about the economic prospects of young Guyanese, questioning whether the...

Read moreDetails
President Irfaan Ali- May 22, 2026 press conference (screengrab)
News

President Ali Coming After Social Media Users as Govt Considers New Laws

by Admin
August 22, 2026

President Irfaan Ali has signalled that his administration is considering tougher legal measures against social media users, warning that Guyana...

Read moreDetails
Next Post

Removal of Vincent Adams will be demoralising to many 


EDITOR'S PICK

The overturned Gulfstream barge involved in the recent oil spill off the coast of Tobago. VINDRA GOPAUL-BOODAN

Two months after oil spill, Tobago slowly recovering

April 6, 2024
Maduro supporters hold signs with the image of Kamla Persad-Bissessar, prime minister of Trinidad and Tobago, during a demonstration against joint military exercises between the US and Trinidad and Tobago. Photograph: Jesús Vargas/picture-alliance/dpa/AP Images

The role one Caribbean country played in helping the US to depose Maduro

January 8, 2026
Pan American Health Organization Director Carissa F. Etienne

Low vaccination rates in the Caribbean must be urgently addressed to stop the spread of COVID-19 says PAHO Director

February 27, 2022
Roysdale Forde S.C

Guyana risks being trapped in cycle of corruption and mismanagement-Forde

February 7, 2025

© 2024 Village Voice

No Result
View All Result
  • Home
  • News
  • Sports
  • Editorial
  • Letters
  • Global
  • Columns
    • Eye On Guyana
    • Hindsight
    • Lincoln Lewis Speaks
    • Future Notes
    • Blackout
    • From The Desk of Roysdale Forde SC
    • Diplomatic Speak
    • Mark’s Take
    • In the village
    • Mind Your Business
    • Bad & Bold
    • The Voice of Labour
    • The Herbal Section
    • Politics 101 with Dr. David Hinds
    • Talking Dollars & Making Sense
    • Book Review 
  • Education & Technology
  • E-Paper
  • Contact Us

© 2024 Village Voice