Saturday, September 12, 2026
Village Voice News
[adning id="37476"]
ADVERTISEMENT
  • Home
  • News
  • Sports
  • Editorial
  • Letters
  • Global
  • Columns
    • Eye On Guyana
    • Hindsight
    • Lincoln Lewis Speaks
    • Future Notes
    • Blackout
    • From The Desk of Roysdale Forde SC
    • Diplomatic Speak
    • Mark’s Take
    • In the village
    • Mind Your Business
    • Bad & Bold
    • The Voice of Labour
    • The Herbal Section
    • Politics 101 with Dr. David Hinds
    • Talking Dollars & Making Sense
    • Book Review 
  • Education & Technology
  • E-Paper
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Sports
  • Editorial
  • Letters
  • Global
  • Columns
    • Eye On Guyana
    • Hindsight
    • Lincoln Lewis Speaks
    • Future Notes
    • Blackout
    • From The Desk of Roysdale Forde SC
    • Diplomatic Speak
    • Mark’s Take
    • In the village
    • Mind Your Business
    • Bad & Bold
    • The Voice of Labour
    • The Herbal Section
    • Politics 101 with Dr. David Hinds
    • Talking Dollars & Making Sense
    • Book Review 
  • Education & Technology
  • E-Paper
  • Contact Us
No Result
View All Result
Village Voice News
No Result
View All Result
Home News

Gov’t to install 3 MW solar PV plant at Cheddi Jagan Int’l Airport

Admin by Admin
February 19, 2026
in News
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

– Site officially handed over to contractors; GEA to oversee project implementation

– Solar PV plant to help reduce facility operating costs and benefit close to 1.2 million passengers annually 

READ ALSO

78 Pounds of Cannabis, $455,000 Cash Seized in September 9 Police Operation

PANCAP Calls for Broader Caribbean Response to Suicide Prevention

As part of its national efforts to continue investing in sustainable energy initiatives that provide affordable, reliable and stable energy, the Government of Guyana, through the Guyana Energy Agency (GEA), has marked a major milestone with the official handover of the project site for construction of the new 3 MW grid-tied solar photovoltaic (PV) plant on Monday.

The project, financed through a loan from the Export-Import (EXIM) Bank of India, is part of the Government’s low-carbon energy agenda to decentralise power generation, strengthen energy security, and lower carbon dioxide emissions to support the country’s rapidly evolving sustainable, low-carbon economy.  

Over its lifespan, the 3 MW solar PV installation is expected to produce more than 112 million kWh of energy. Once completed, the solar plant will supply renewable electricity to benefit more than 1.2 million passengers who travel through the airport annually. It will also reduce operating costs, enhance efficiency for airport management and staff, and decrease the reliance on the utility grid. 

In 2025, a pre-qualification (PQ) process was launched by the Export-Import (EXIM) Bank of India, which resulted in the shortlisting of eight companies. However, only three companies submitted bids for the project. Following the evaluation, the contract was awarded to Oriana Power Limited for the sum of US$2,487,170.

Following a recent joint inspection and site visit involving project stakeholders, the site was officially handed over to the contractor, Oriana Power Limited, to commence work.

“The Guyana Energy Agency is thrilled to be part of another strategic sustainable energy investment that advances Guyana’s Low Carbon Development Strategy 2030,” said Dr. Mahender Sharma, Chief Executive Officer of the GEA. “By integrating large-scale solar power into our critical infrastructure, we are making steady, tangible progress in keeping with our renewable energy goals as a nation,” he added.

Krishnan Kutty Jaigopal, a representative from Oriana Power Limited, said at the official site handover, “We are committed to delivering the project in an effective and efficient timeline and without any cost variation,” stating that the objective is to ensure the successful construction and operation of the solar PV plant. 

The Guyana Energy Agency remains committed to providing rigorous oversight throughout the implementation of the 3 MW solar PV plant project, to ensure that it meets its execution timelines and technical standards, while further advancing the country’s sustainable, low-carbon agenda.

ShareTweetSendShareSend

Related Posts

File photo
News

78 Pounds of Cannabis, $455,000 Cash Seized in September 9 Police Operation

by Admin
September 11, 2026

Police seized 78 pounds of suspected cannabis and more than $455,000 in cash during an operation at Five Mile, Ituni...

Read moreDetails
News

PANCAP Calls for Broader Caribbean Response to Suicide Prevention

by Admin
September 11, 2026

The Pan Caribbean Partnership against HIV and AIDS is calling for stronger action across the region to prevent suicide, following...

Read moreDetails
Gas station bombed on October 25, 2025
News

Three Accused Challenge Evidence in Mobil Bombing Case

by Admin
September 11, 2026

Three of the four people accused in connection with the deadly bombing at a Georgetown Mobil service station have challenged...

Read moreDetails
Next Post

MoE Expands UG's Engineering Programmes to Regions 2, 6


EDITOR'S PICK

Government ramps up efforts to strengthen Guyana’s flood resilience

July 23, 2024
L-R Leader of the Opposition Aubrey Norton and Columnist GHK Lall

Agreeing and disagreeing with Mr. Norton

March 31, 2025

WORD OF THE DAY: PROPINQUITY

August 27, 2024

Opposition counters Government poor handling of cost of living with progressive proposals

January 5, 2024

© 2024 Village Voice

No Result
View All Result
  • Home
  • News
  • Sports
  • Editorial
  • Letters
  • Global
  • Columns
    • Eye On Guyana
    • Hindsight
    • Lincoln Lewis Speaks
    • Future Notes
    • Blackout
    • From The Desk of Roysdale Forde SC
    • Diplomatic Speak
    • Mark’s Take
    • In the village
    • Mind Your Business
    • Bad & Bold
    • The Voice of Labour
    • The Herbal Section
    • Politics 101 with Dr. David Hinds
    • Talking Dollars & Making Sense
    • Book Review 
  • Education & Technology
  • E-Paper
  • Contact Us

© 2024 Village Voice