Tuesday, July 7, 2026
Village Voice News
ADVERTISEMENT
  • Home
  • News
  • Sports
  • Editorial
  • Letters
  • Global
  • Columns
    • Eye On Guyana
    • Hindsight
    • Lincoln Lewis Speaks
    • Future Notes
    • Blackout
    • From The Desk of Roysdale Forde SC
    • Diplomatic Speak
    • Mark’s Take
    • In the village
    • Mind Your Business
    • Bad & Bold
    • The Voice of Labour
    • The Herbal Section
    • Politics 101 with Dr. David Hinds
    • Talking Dollars & Making Sense
    • Book Review 
  • Education & Technology
  • E-Paper
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Sports
  • Editorial
  • Letters
  • Global
  • Columns
    • Eye On Guyana
    • Hindsight
    • Lincoln Lewis Speaks
    • Future Notes
    • Blackout
    • From The Desk of Roysdale Forde SC
    • Diplomatic Speak
    • Mark’s Take
    • In the village
    • Mind Your Business
    • Bad & Bold
    • The Voice of Labour
    • The Herbal Section
    • Politics 101 with Dr. David Hinds
    • Talking Dollars & Making Sense
    • Book Review 
  • Education & Technology
  • E-Paper
  • Contact Us
No Result
View All Result
Village Voice News
No Result
View All Result
Home News

Chinese firm to build new Demerara Harbour Bridge at US$256.6M

Staff Reporter by Staff Reporter
November 1, 2021
in News
0
SHARES
0
VIEWS
Share on FacebookShare on Twitter

Government said that Cabinet has granted its no-objection for the Ministry of Public Works (MoPW) to engage China State Construction Engineering Corporation Ltd. to construct the New Demerara Harbour Bridge (NDHB) based on a Design-Build-Finance (DBF) model with financial terms and conditions which would be no less favorable than those submitted in the preferred bidder’s price proposals.

The proposal by China State Construction Engineering Corporation Ltd under the DBF model contemplates a construction cost of US$256.6 million, the lowest amongst all bidders, the Ministry of Finance has said.

READ ALSO

Joint declaration reinforces commitment to the One Health approach in the Americas

Guyana Development Bank to empower next generation of entrepreneurs

Initially, the Government of Guyana, through the MoPW, pre-qualified nine (9) firms to submit bids for the construction of a two-lane dual carriageway (4 lanes) hybrid Cable-Stayed center span bridge with Concrete Box/T Beam Girder approach bridge structure with the following inclusions:

•    Bridge collision protection.

•    Navigation span to accommodate Handymax vessel Navigation aids.

•    Lighting, signage, and all other ancillary works.

•    Access road with a minimum of 50 meters up to abutments.

•    Toll collection buildings and ancillary buildings on the West Bank of the Demerara River.

The pre-qualified firms were invited to submit bids to construct the bridge using a Design-Build-Finance (D-B-F) contract and Design-Build-Finance-Operate-Maintain (D-B-F-O-M) contract. At the pre-bid meeting, held on June 28, 2021, it was agreed that the closing date for submission of bids would be October 5, 2021. Only five of the pre-qualified bidders submitted bids, of which four (4) obtained the required minimum score for the technical proposal. The Evaluation Committee recommended that the Procuring Entity engage China State Construction Engineering Corporation Ltd. using the Design-Build-Finance (DBF) model on financing terms and conditions no less favourable than those proposed by the highest ranked bidder. The NPTAB subsequently submitted the recommendation to Cabinet, and Cabinet granted its ‘no objection’.

The NDHB comprises a critical component of the Government’s drive to expand and modernize Guyana’s transport infrastructure. It aims to replace the aging Demerara Harbour Bridge with a modern four-lane structure that will facilitate greater traffic capacity and dramatically improve commuter convenience. The new bridge will offer easy connectivity to both the existing East Bank Demerara road as well as the new Diamond to Ogle bypass on the eastern side of the River and to the existing West Bank Demerara Road and the new Parika to Schoonord Road on the western side of the River. The new bridge will also offer critical connectivity to the new Wales Development Authority which will be a major centre of productive activity when it comes on stream.

ShareTweetSendShareSend

Related Posts

News

Joint declaration reinforces commitment to the One Health approach in the Americas

by Admin
July 7, 2026

The initiative will strengthen coordination among members of the Quadripartite Alliance in the Americas (FAO, WOAH, PAHO/WHO and UNEP) and...

Read moreDetails
News

Guyana Development Bank to empower next generation of entrepreneurs

by Admin
July 7, 2026

The establishment of the Guyana Development Bank is expected to open new pathways for business development and expansion, particularly for...

Read moreDetails
President Dr Mohamed Irfaan Ali at the commissioning of the new drug bond in Onderneeming, Region Two
News

Government ramps up cancer screening drive in Region Two

by Admin
July 7, 2026

President Dr Mohamed Irfaan Ali has called for an aggressive public awareness campaign to ensure at least 3,000 women in...

Read moreDetails
Next Post
Attorney General and Minister of Legal Affairs, Anil Nandlall SC (L) and Shadow Minister Senior Counsel Roysdale Forde S.C (R)

More blows for Nandlall


EDITOR'S PICK

CGTN Photo

China to expand basic medical insurance coverage for children

March 3, 2024

WORD OF THE DAY: DAMASK

February 2, 2024
Roysdale Forde, S.C, M.P

Even as we affirm, we must recognise the need to root out petty politics in protecting Guyana’s Territory and People

November 5, 2023
Trinidad and Tobago Airport

TRINIDAD & TOBAGO | When Uncle Sam Comes Calling: The Sovereignty vs Security Dance at T&T’s Airports

August 26, 2025

© 2024 Village Voice

No Result
View All Result
  • Home
  • News
  • Sports
  • Editorial
  • Letters
  • Global
  • Columns
    • Eye On Guyana
    • Hindsight
    • Lincoln Lewis Speaks
    • Future Notes
    • Blackout
    • From The Desk of Roysdale Forde SC
    • Diplomatic Speak
    • Mark’s Take
    • In the village
    • Mind Your Business
    • Bad & Bold
    • The Voice of Labour
    • The Herbal Section
    • Politics 101 with Dr. David Hinds
    • Talking Dollars & Making Sense
    • Book Review 
  • Education & Technology
  • E-Paper
  • Contact Us

© 2024 Village Voice