Saturday, July 11, 2026
Village Voice News
ADVERTISEMENT
  • Home
  • News
  • Sports
  • Editorial
  • Letters
  • Global
  • Columns
    • Eye On Guyana
    • Hindsight
    • Lincoln Lewis Speaks
    • Future Notes
    • Blackout
    • From The Desk of Roysdale Forde SC
    • Diplomatic Speak
    • Mark’s Take
    • In the village
    • Mind Your Business
    • Bad & Bold
    • The Voice of Labour
    • The Herbal Section
    • Politics 101 with Dr. David Hinds
    • Talking Dollars & Making Sense
    • Book Review 
  • Education & Technology
  • E-Paper
  • Contact Us
No Result
View All Result
  • Home
  • News
  • Sports
  • Editorial
  • Letters
  • Global
  • Columns
    • Eye On Guyana
    • Hindsight
    • Lincoln Lewis Speaks
    • Future Notes
    • Blackout
    • From The Desk of Roysdale Forde SC
    • Diplomatic Speak
    • Mark’s Take
    • In the village
    • Mind Your Business
    • Bad & Bold
    • The Voice of Labour
    • The Herbal Section
    • Politics 101 with Dr. David Hinds
    • Talking Dollars & Making Sense
    • Book Review 
  • Education & Technology
  • E-Paper
  • Contact Us
No Result
View All Result
Village Voice News
No Result
View All Result
Home News

GEA inks agreement with Farfan & Mendes, SOVENTIX for $1B hinterland solar power plants

Staff Reporter by Staff Reporter
November 12, 2020
in News
Representatives of GEA, Farfan & Mendes Limited and SOVENTIX Caribbean S.R.L sign an agreement for hinterland solar power plants

Representatives of GEA, Farfan & Mendes Limited and SOVENTIX Caribbean S.R.L sign an agreement for hinterland solar power plants

0
SHARES
0
VIEWS
Share on FacebookShare on Twitter
Representatives of GEA, Farfan & Mendes Limited and SOVENTIX Caribbean S.R.L sign an agreement for hinterland solar power plants

The Guyana Energy Agency (GEA) has entered into an Agreement with Farfan & Mendes Limited and SOVENTIX Caribbean S.R.L for the execution of the engineering, procurement, construction and installation and commissioning of solar photovoltaic power plants including Battery Energy Storage Systems for the hinterland at Bartica and Lethem in two lots.
The total contract amount for the two solar PV farms at Lethem and Bartica is GY$1.098 billion dollars. The duration for the completion of the two sites is estimated at 330 days.

The Agreement was signed on Wednesday at the Office of the Prime Minister in the presence of Derrick Cummings – Permanent Secretary, Office of the Prime Minister; Dr. Mahender Sharma – Chief Executive Officer of the GEA; Mr. Martin Carto – Alternative Energy Manager of Farfan & Mendes and SOVENTIX, and Mr. Mfon Akpan – Project Coordinator of GEA.

READ ALSO

Trinidad and Tobago Joins Guyana-Led Global Biodiversity Alliance

Court Dismisses Cybercrime Charges Against Bryan Max

From the eight companies – both local and international – which participated in the bidding process that commenced with the opening of bids on January 7, 2020, Farfan & Mendes Limited and SOVENTIX Caribbean S.R.L emerged as the winning bidder.
In a statement, the GEA said that Farfan & Mendes Limited and SOVENTIX Caribbean S.R.L complied with all the requirements necessary for the execution of the project, inclusive of being substantially responsive to the terms and conditions of the bidding documents and also representing the lowest evaluated cost.

This project falls under the renewable energy solutions for the hinterland, which is one of the major components under the Energy Matrix Diversification and Strengthening of the Department of Energy (EMISDE) programme funded by the Inter-American Development Bank (IDB).

“The renewable energy solutions for the hinterland seeks to address the energy diversification policy goals of the Government of Guyana, by increasing the electricity access for the hinterland/rural areas with renewable energy solutions,” the statement said.
By the end of 2023, this programme will finance the investment in solar technology by providing a reliable electricity source to the expanding needs of power supply in the three hinterland townships, currently relying on fossil fuel.

This will involve the installation of three solar Photovoltaic farms in Bartica (1.5MW), Lethem (1.0MW), and Mahdia (0.65MW), totalling approximately 3.15 megawatts and implementation of a storage capacity to manage intermittence of these sources.
The GEA thanked all the companies involved in the bidding process and said it looks forward to their active participation during the upcoming bidding process for the Mahdia solar PV farm.

ShareTweetSendShareSend

Related Posts

President Dr Mohamed Irfaan Ali hands over a Global Biodiversity Alliance membership certificate to Trinidad and Tobago’s Prime Minister Kamla Persad-Bissessar
News

Trinidad and Tobago Joins Guyana-Led Global Biodiversity Alliance

by Admin
July 10, 2026

Trinidad and Tobago has officially become the 125th member of the Global Biodiversity Alliance (GBA), a Guyana-led initiative aimed at...

Read moreDetails
Bryan Max
News

Court Dismisses Cybercrime Charges Against Bryan Max

by Admin
July 10, 2026

Nearly three years after he was violently beaten by armed attackers and later prosecuted under Guyana's controversial Cybercrime Act, political...

Read moreDetails
Attorney General and Minister of Legal Affairs Anil Nandlall, SC,
News

Former Presidents’ benefits bill replicates 2009 law, ensures equal treatment – AG Nandlall

by Admin
July 10, 2026

Attorney General and Minister of Legal Affairs Anil Nandlall, SC, has noted that the Former Presidents’ Benefits and Other Facilities...

Read moreDetails
Next Post

Shop keeper chopped over gold detector in Big Creek Backdam 


EDITOR'S PICK

President Mohamed Irfaan Ali

Guyana leading CARICOM’s drive to reduce food bill with transformative projects, says President Ali

September 2, 2023
General Manager of the Country Department of the Caribbean at the IDB, Anton Edmunds

IDB-funded Agriculture Information System to access real-time data launched Monday

October 9, 2024
Former President David Granger

PPP must fulfil constitutional mandate to prevent vector-borne disease, says Granger

January 26, 2025
Researchers work at "Nanfan Silicon Valley" in south China's Hainan Province, February 23, 2022. /VCG

China reaffirms commitment to advancing agricultural technology

February 24, 2025

© 2024 Village Voice

No Result
View All Result
  • Home
  • News
  • Sports
  • Editorial
  • Letters
  • Global
  • Columns
    • Eye On Guyana
    • Hindsight
    • Lincoln Lewis Speaks
    • Future Notes
    • Blackout
    • From The Desk of Roysdale Forde SC
    • Diplomatic Speak
    • Mark’s Take
    • In the village
    • Mind Your Business
    • Bad & Bold
    • The Voice of Labour
    • The Herbal Section
    • Politics 101 with Dr. David Hinds
    • Talking Dollars & Making Sense
    • Book Review 
  • Education & Technology
  • E-Paper
  • Contact Us

© 2024 Village Voice